Early
in 2002, the City of Tullahoma was informed by the Tennessee Department
of Environment and Conservation that it would likely be designated
as a regulated small MS4 (Municipal Separate Storm Sewer System) to
be covered under the Phase II NPDES Storm Water Discharge Control
Program. On December 9, 2002, the City of Tullahoma was officially
designated as a small MS4 in accordance with EPA regulations at 40
CFR 123.35(b). The designation required that the City of Tullahoma
apply for coverage under an NPDES Permit within 180 days of the date
of designation. The City of Tullahoma did so and is permitted under
tracking number TNS077631.
The Phase II Stormwater Regulations, found at 40
CFR Part 122, require the City of Tullahoma at a minimum, to develop,
implement, and enforce a stormwater management program designed
to reduce the discharge of pollutants from the MS4 to the maximum
extent practicable (MEP), to protect water quality, and to satisfy
the appropriate water quality requirements of the Clean Water Act.
The stormwater management program shall be based around 6 Minimum
Control Measures. The 6 Minimum Control Measures are as follows:
• PUBLIC EDUCATION AND OUTREACH
• PUBLIC PARTICIPATION AND INVOLVEMENT
• ILLICIT DISCHARGE DETECTION AND ELIMINATION
• CONSTRUCTION SITE RUNOFF CONTROL
• POST-CONSTRUCTION RUNOFF CONTROL
• POLLUTION PREVENTION AND GOOD HOUSEKEEPING
View our Complete
Storm Water Management Plan
One of the City of Tullahoma's Best Management Practices
that was outlined in the Phase II Stormwater Notice of Intent and
filed with the State of Tennessee was to revise the ordinances that
pertained to stormwater.
View
Tullahoma's Ordinance on Stormwater Management
The City has developed a guide to Tullahoma's approval
process for land disturbance and stormwater activities.
View
guide for City's approval process for land disturbance and stormwater
activities
Tullahoma has developed a
Stormwater Hotline. Call 931-454-1768 about stormwater
activities.
Email
your questions or comments about stormwater if you prefer
Copies
of Permit Application Forms and a Plan Review checklist can be printed
from our site. Forms have to be submitted to the Public Works Department.
Click
here for a copy of the Land Disturbance and Stormwater Protection
Permit Application Form
Click
here for a copy of the Residential Stormwater Protection Permit
Click
here for copy of Plan Review Checklist
Click
here for a copy of the Stormwater Detention Facility Construction
& Maintenance Agreement
Back
to Public Works
|